A mammoth 2 year strengthening project. BDX supplied up to 35 fabricator welders working day and night over a 24 month duration to strengthen the existing complex to a minimum of 67% NBS. The centre remained operational throughout the works which added significant complexities from a health and safety perspective. The project involved meticulous planning and control in order to complete on time and on budget.
Having BDX by your side opens the door to a world of knowledge, creativity, and accuracy.
We are dedicated to working closely with you to learn about your specific requirements, so that the final result fully reflects your vision. Your next project is more than just another assignment- it's an engineering challenge, and with BDX, trust us to go above and beyond to make things happen.
Made with ❤️ by 1768degrees.com. Helping Entrepreneurs Grow.
Built on Aotearoaweb.com.
2023 BDX Engineering. All Rights Reserved.